Testing was performed at the Electric Vehicle Technical Center (EVTC), at the Pomona Raceway, and on the Urban and Freeway Pomona Loops. Data for a 1998 Altra, equipped with Sony Li-Ion batteries, is presented for comparison purposes. For detailed procedures used for the testing, please refer to the SCE Electric Vehicle Test Procedure in Appendix G, page 49.
Also refer to Appendix C, page 28, for maps of the Urban and Freeway Pomona Loops. Acceleration, Braking, and Maximum Speed Tests Performance testing of the 2000 model-year Nissan Altra EV took place at the Pomona Raceway, in Pomona CA.
Friday, April 15, 2011
Performance Characterization 2000 Nissan Altra
Labels:
2000,
Altra,
Characterization,
Nissan,
Performance
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment